Ill just add an adjustable low voltage cutout when I add my bypass if thats the case. thats an easy fix. It'll add some more parasitic drain to the system, but, the trickle charge solar will handle that.I hope they are not right. I’ve been led to believe there will always be enough charge left to start the vehicle but haven't tested that theory. I always use solar power when camped up for a few days. When the early Grenadiers like mine were delivered we could use the auxiliary load terminal on the smart pass to connect some auxiliary loads in the knowledge that the smartpass would cut off those loads when battery capacity got down to 50% but that terminal got blanked off on all Grenadiers as a routine when they were serviced at a dealers. Keen to learn what your dealer finds.
I'm starting to feel like i'll be trying to tune a bagpipe.